Previous Page  14 / 32 Next Page
Information
Show Menu
Previous Page 14 / 32 Next Page
Page Background

V

irginia

C

apitol

C

onnections

, S

ummer

2017

14

RICHMOND, VA – The

Department of General Services

(DGS) announced today that a

temporary fence will be erected

around the General Assembly

Building on August 1 so the

Commonwealth can begin

abatement and demolition of

the building then construction

of a new facility.

The fencing will have the

following impacts:

• From August 1 through the

end of the year, the sidewalk

along the south side of

Broad Street will close from

9th Street to 10th Street.

Beginning in December,

the southernmost lane of

eastbound Broad Street also

will close and will remain

closed through 2021.

• Beginning August 1, the

east lane and sidewalk of

9th Street will close from

the Capitol Square fence

to Broad Street and remain

closed through 2021.

• Beginning August 1, two northwest entrances to Capitol Square

will be inaccessible and remain closed through 2021.

General

Assembly

Building

9th Street

Broad Street

Capitol Square

Closures

Fence

August 1

through

December

2017

Fence beginning December 2017

General Assembly Building Fence to Impact

Pedestrian, Vehicle Traffic through 2021

Fence will be erected on August 1

• Beginning August 1, 10th Street will close to traffic. Those state

employees who park along 11th Street near the Patrick Henry

Building will enter and exit at that street.

Available

in January

To be

included contact

virginiacapitolconnections@gmail.com

D

A V I D

B

A I L E Y

A

S S O C I A T E S

.

C O M

2018 Blackbook

Lobbyists

P U B L I C AT I O N S

V